View of the forward docking target on Pressurized Mating Adapter PMA 2 attached to the International Space Station ISS Destiny U.S. Laboratory. Also visible in the frame is the Canadarm2 RMS. Image was taken by an STS-111 UF-2 crewmember during approach for docking. Docking occurred on 6/7/02.